KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  6-6-2012
Number of Hours:  0.50
Manual Reference:  ch 25
Brief Description:  Installing the ice shields

I went ahead and used dry micro to bond the ice shields to the canard. This way I will be able to contour a shape before laying down the second layer of glass. Should turn out real nice.
' style=

bonding with micro

bonding with micro

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.