KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  12-8-2016
Number of Hours:  2.00
Manual Reference:  ch 10
Brief Description:  Tips keep getting frosting

After aggressively sanding the top layer of micro, there were several voids that needed attention but I was quite ready to take the Z-Grip Plunge so I moved on to prepare the bottom for micro. I started by cutting and installing aluminum tubes that act as guides for the screws. These tubes will most likely be faired over with tape or a small amount of silicone for smooth airflow. After getting them in using 5 minute epoxy, I spread a nice thick layer of micro all over the bottom surface as well as the voids on the top surface. It's gonna get down to 34 degrees tonight so I'm hoping I can sand it tomorrow morning. These tips should be airworthy in a few days and boy do they look mean on the canard.
' style=

Screw guide tubes installed

Screw guide tubes installed

' style=

Micro on the lower half

Micro on the lower half

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.