KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  4-26-2016
Number of Hours:  2.00
Manual Reference:  ch 10
Brief Description:  Canard re-assembly

The canard has been getting worked on now for what seems like forever. And while I'm not 100% satisfied with my paint finish, it was my first time painting so I get at least an A- right? :) For now this will be a great test bed for the paints' durability and tempurature levels. I went with Steel metallic for the inside of the tips and oil rubbed bronze for the outside. I'm excited to fly this thing very carefully 1 knot at a time especially in testing it in a hard slip.
' style=

oil rubbed bronze paint

oil rubbed bronze paint

' style=

all assembled for dry fit

all assembled for dry fit

' style=

I love the way this looks

I love the way this looks

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.