KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  5-9-2012
Number of Hours:  4.00
Manual Reference:  ch 24
Brief Description:  Glassing the passenger consoles

I pre-pregged the final 2 layer BID for both passenger consoles. The plans suggest using saran wrap on areas that are prone to lifting so I thought I'd try it on one to see the difference after curing. Doing a pre-preg on a layup that is 56" long was no easy task when it came to pulling it off the table and laying it out on the console. I did however find that I could fold it, even after applying epoxy and then unfold it on top of the console with no problems.
' style=

ready for slurry

ready for slurry

' style=

first time adding saran wrap

first time adding saran wrap

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.