Powered By Kitlog Pro v2.0
Long Ez: Building a Dream
Long Ez
Fuselage
5-8-2012
< Previous Log Entry
Next Log Entry >
Date:
5-8-2012
Number of Hours:
1.00
Manual Reference:
ch 24
Brief Description:
Consoles Trim and Fit
Trimmed up the Front Consoles and they fit great. Pre-preg worked great
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Long Ez Home
All
Avionics
Canard
Canopy
Control System
Electrical System
Elevators
Finishing
Firewall
Fuel system
Fuse Exterior
Fuselage
Instrument Panel
Landing Brake
Main Landing Gear
Nose and Nose gear
Plans
Shop Supplies
Spar
Strakes
The Beginning
Throttle
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.