KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  5-1-2012
Number of Hours:  4.50
Manual Reference:  ch 24
Brief Description:  Consoles prep for glass

I filled the joints with micro to give an easier transition for the glass work, while strengthening the joint at the same time. I Also added the final triangle pieces of foam to the passenger consoles and all 4 are now ready for glass.>
Update: Pilot Consoles are glassed on the inside
' style=

micro joint and triangle ends added

micro joint and triangle ends added

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.