KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  8-26-2014
Number of Hours:  10.50
Manual Reference:  ch 22
Brief Description:  Switch wires, speed brake and cleanup

Over 10 hours to wire the speed brake, all the panel switches and comb through the wires. I tightened up every path with temporary zip ties that will be replaced with permanent ones or nylon strand when absolutely everything is finished inside this beast. All of the D-Sub connections I left alone for Harrison Avionics to do when they arrive on Saturday. Only a few more power and ground wires are left to run along with the EIS Data lines so Saturday shouldn't feel too rushed. I will be doing everything I can on my end before they arrive. Stay tuned!
' style=

Switches wired up

Switches wired up

' style=

USB and switches are wired

USB and switches are wired

' style=

Speed brake wired

Speed brake wired

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.