Powered By Kitlog Pro v2.0
My Web Site
RV-12
Engine
4-3-2010
< Previous Log Entry
Next Log Entry >
Date:
4-3-2010
Number of Hours:
3.00
Manual Reference:
45-08, 46-02 to 03
Brief Description:
Control Board, Engine Preparation
Completed final testing and adjustment of control board and avionics as per page 45-08. Installed tie wraps on wires.
Began preparations for engine installation as per Steps 1-8, page 46-02 and Step 1, page 46-03.
Finished wire connections for autopilot pitch servo as per Steps 4-9, page 44-06.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-12 Home
Category
# Logs
# Hours
All
365
903
Autopilot
7
7
Avionics
7
24
Empennage
51
134
Engine
39
90
Finish Kit
90
232
Fuselage
90
240
Lighting Kit
14
28
Miscellaneous
3
15
Production Acceptanc
3
12
Wings
61
121
Copyright © 2001-2025 Matronics. All Rights Reserved.