Reinstalled vertical stablizer and rudder in preparation for rudder cable installation. Installation completed according to Steps 1-4, page 11-02 and all attach bolts torqued to 30 in-lbs and marked with torque seal.
Installed rudder cables as per Steps 1-7, page 32-11 and Steps 1-2, page 32-12.