KitLog pro

Powered By Kitlog Pro v2.0

My Web Site
' style=
Date:  3-6-2010
Number of Hours:  6.75
Manual Reference:  34-14 to 34-15
Brief Description:  Canopy Fiberglass Started

Finished prep for fiberglass by sanding the canopy foam and marking, masking, and roughing bonding surfaces as per Steps 1-3, page 34-15.

Installed fiberglass to both sides of the canopy as per Steps 6-8, page 34-14. Applied peel ply following installation.

Cut strips of glass fabric as per Step 1, page 34-15.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.