Powered By Kitlog Pro v2.0
My Web Site
RV-12
Empennage
6-3-2009
< Previous Log Entry
Next Log Entry >
Date:
6-3-2009
Number of Hours:
2.50
Manual Reference:
11-04, -07 to -09
Brief Description:
AST Installation
Prepared AST hinge pins and installed the R and L AST assemblies as per Steps 1-4, page 11-04.
Installed, tested, and adjusted AST servo assembly as per Steps 8-10, page 11-07 and Steps 1-3, page 11-08.
Temporarily fit forward VS skin as per Step 1, page 11-09.
Section 11 completed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-12 Home
Category
# Logs
# Hours
All
365
903
Autopilot
7
7
Avionics
7
24
Empennage
51
134
Engine
39
90
Finish Kit
90
232
Fuselage
90
240
Lighting Kit
14
28
Miscellaneous
3
15
Production Acceptanc
3
12
Wings
61
121
Copyright © 2001-2024 Matronics. All Rights Reserved.