|
|
My Web Site
|
Date: 3-20-2009
|
Number of Hours: 10.00
|
Manual Reference: 6-04 to 6-07
|
Brief Description: Vertical Stabilizer Assembly
|
|
Completed VS parts preparation, including deburring, fluting, and edge radiusing of ribs as per Steps 1-6, page 6-04 and Steps 1 and 2, page 6-05. Assembled VS skeleton as per Steps 3-8, page 6-05.
Prepared VS skins, including trimming, deburring, dimpling, and installation of nutplates as per Steps 1-9, page 6-06.
Installed main and foward skins, and uppper hinge assembly as per Steps 1-5, page 6-07.
Section 6 completed.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |