|
|
My Web Site
|
Date: 1-17-2009
|
Number of Hours: 5.75
|
Manual Reference: 21-19, 21-20
|
Brief Description: Completion of Section 21, Start Section 22
|
|
Riveted step floors as per Steps 3-4, page 21-19.
Prepared and installed F-1207B bulkhead as per Steps 5-8, page 21-19.
Prepared and installed Facet fuel pump bracket as per Steps 9-11, page 21-19.
Installed six system block studs as per Step 1, page 21-20 (Anna assisted).
Section 21 completed.
Began deburring and countersinking/dimpling tunnel assembly parts, Steps 1 and 2, page 22-02. Fabricated firewall spacers, Step 10, page 22-02.
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |