Finished canopy skirt installation, including drilling through canopy sides and attach angles as per Steps 5 and 6, page 34-06 and Steps 1-3, page 34-07. Maria assisted with drilling of the canopy and attach angles.
Checked canopy for clearance, removed, and sanded a bit more from the front edge due to interference with the instrument panel upon opening.
Final drilled all canopy holes to #27 using a plexiglas bit and hand drill. Deburred all holes.
Countersunk the holds along the front edge of the canopy using a #30 permagrit countersink bit.
Countersunk and installed C-1207 guide blocks as per Steps 1 and 2, page 34-08.
Deburred and trimmed C-1206 guide plates and installed them as per Step 3, page 34-08.