Powered By Kitlog Pro v2.0
My Web Site
RV-12
All
12-18-2009
< Previous Log Entry
Next Log Entry >
Date:
12-18-2009
Number of Hours:
3.50
Manual Reference:
30-04, 32-9, -10
Brief Description:
Flaperon Install, Torque Tube Drilling
Mike came over and assisted with installation of flaperons, Steps 1-3, page 30-04.
Wings were installed to the fuselage and then the flaperons were positioned and drilled as per Steps 3 and 4, page 32-09 and Steps 1-5, page 32-10.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-12 Home
Category
# Logs
# Hours
All
365
903
Autopilot
7
7
Avionics
7
24
Empennage
51
134
Engine
39
90
Finish Kit
90
232
Fuselage
90
240
Lighting Kit
14
28
Miscellaneous
3
15
Production Acceptanc
3
12
Wings
61
121
Copyright © 2001-2024 Matronics. All Rights Reserved.