Today was the big day to trial fit the wings for the first time. Mike Sojka assisted in moving the fuselage to the driveway and then the wings were fit as per Steps 6-8, page 30-02 and Steps 1-4, page 30-03. First construction photos I have taken in some time, as most work over the past month has been small stuff!