Date:  3-25-2009
Number of Hours:  1.00
Manual Reference:  28-06
Brief Description:  Fuel System

Installed the bulkhead fuel return line fitting as per Step 1, page 28-06. Completed fabrication of the aft end of the forward fuel return line and attached to the bulkhead fitting as per Step 10, page 28-06.

Only remaining steps for Section 28 are fabrication of the aft fuel return line and tightening of all flare fittings.


Total time to date on fuselage is 168.50 hours (excluding time for review of construction manual and builder's log entries).