Powered By Kitlog Pro v2.0
My Web Site
RV-12
All
1-25-2009
< Previous Log Entry
Next Log Entry >
Date:
1-25-2009
Number of Hours:
2.50
Manual Reference:
22-03 to 22-05
Brief Description:
Tunnel Assembly Completion
Attached F-1201L bracket to tunnel rib and firewall bottom as per Steps 8-11, page 22-03.
Installed Flo-Scan mount bracket as per Steps 1-3, page 22-04.
Attached the tunnel assembly to the mid fuselage section as per Step 1, page 22-05.
Section 22 completed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-12 Home
Category
# Logs
# Hours
All
365
903
Autopilot
7
7
Avionics
7
24
Empennage
51
134
Engine
39
90
Finish Kit
90
232
Fuselage
90
240
Lighting Kit
14
28
Miscellaneous
3
15
Production Acceptanc
3
12
Wings
61
121
Copyright © 2001-2024 Matronics. All Rights Reserved.