Powered By Kitlog Pro v2.0
My Web Site
RV-12
All
7-24-2010
< Previous Log Entry
Next Log Entry >
Date:
7-24-2010
Number of Hours:
9.00
Manual Reference:
PAP G4 and G6
Brief Description:
PAP and First Engine Run
Completed Production Acceptance Procedures G4 and G6 in preparation for first engine run.
First engine start successful! All temperature and pressure readings on Dynon within limits.
Synchronized carbs per maintenance manual and then performed runup and ignition check. All checks within limits.
Removed temporary carb sych fittings and restored crossover fittings to original configuration.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-12 Home
Category
# Logs
# Hours
All
365
903
Autopilot
7
7
Avionics
7
24
Empennage
51
134
Engine
39
90
Finish Kit
90
232
Fuselage
90
240
Lighting Kit
14
28
Miscellaneous
3
15
Production Acceptanc
3
12
Wings
61
121
Copyright © 2001-2024 Matronics. All Rights Reserved.