Powered By Kitlog Pro v2.0
My Web Site
RV-12
All
5-31-2010
< Previous Log Entry
Next Log Entry >
Date:
5-31-2010
Number of Hours:
9.00
Manual Reference:
37, 40, 49, 50
Brief Description:
Fuel, Lighting, Interior
Installed fuel tank- still need to tighten fittings to bottom of tank.
Installed cockpit eyeball light as per Steps 7-10, page 40-11. Installed blast tube for regulator as per Steps 8-11, page 40-12.
Installed shroud SCAT hose as per page 49-18.
Started installation of throttle cable as per page 50-02.
Installed baggage compartment trim kit as per interior trim instructions.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-12 Home
Category
# Logs
# Hours
All
365
903
Autopilot
7
7
Avionics
7
24
Empennage
51
134
Engine
39
90
Finish Kit
90
232
Fuselage
90
240
Lighting Kit
14
28
Miscellaneous
3
15
Production Acceptanc
3
12
Wings
61
121
Copyright © 2001-2024 Matronics. All Rights Reserved.