Powered By Kitlog Pro v2.0
Ebby's Hatz Classic
Classic
Fuselage
2-15-2004
< Previous Log Entry
Next Log Entry >
Date:
2-15-2004
Number of Hours:
1.00
Manual Reference:
Brief Description:
Torque Tube control stick flanges
The two flanges were clamped to a piece of 1 1/2" scrap axle material. Heat was applied to the steel and taped around the axle.
One flange is cooling as the other is shaped.
Just set in place to finish off the days work.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Classic Home
Category
# Logs
# Hours
All
239
616
Cowling
3
6
Empennage
69
196
Engine
4
11
Firewall Forward
7
24
Fuselage
141
346
Instruments
6
12
Shop Supplies
5
12
Systems
1
1
Tools
1
4
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.