Originally I was going to have a main tank and a header tank. Then thought a 28 gallon main tank would be plenty as the endurance would be nearly 4 hours. So one main tank it is. The support is 1/4" tubing and .050" bracket. The bracket was made from a tracing held against the valve. Additional guides for the shut-off shaft were welded to carry the shaft back to the pilots cockpit.