KitLog pro

Powered By Kitlog Pro v2.0

Ebby's Hatz Classic
' style=
Date:  3-10-2006
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Cowling-forward instrument panel

I test fit the flange for the upper part of the forward instrument panel. The need for a metal stretcher once again appears. Bending the tabs back allows the top edge of the flange to be parallel with the cowling cover. A bit of stretching would be good but I believe the anchor nuts will draw all the pieces together. Each tab is flush riveted with a 1/8" AD. Unfortunately the flange is too deep so I could not use the squeezer.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.