KitLog pro

Powered By Kitlog Pro v2.0

Ebby's Hatz Classic
' style=
Date:  2-16-2004
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Making a torque tube flange

Two of these flanges need to be made. One for each cockpit station. After the initial bend, the flange is tack welded to a scrap of tubing the same size as the torque tube. A torch is then used to heat the tabs to an orange or until the metal becomes p
' style=

Flange is positioned on scrap tube.

Flange is positioned on scrap tube.

' style=

Using A/O heat to orange and mold around tube.

Using A/O heat to orange and mold around tube.

' style=

After true and level tack weld flange to tube.

After true and level tack weld flange to tube.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.