Began rigging of the rudder cables. Installed the nylon fairlead inside the fuse, ran cables, installed clevis, nicopress sleeves. Had to re-do the pilot side cable due to a poor crimp job on the sleeve. Needed to expand the fuselage hole for the cable to about 2 times it's original size to get the cable to clear the fuse skin. It all turned out pretty well, nice and solid.
total hrs. to date: 664
had to open up fuse hole both ways to clear cable.