|
|
Jimmys CH750 builder log
|
Date: 8-23-2011
|
Number of Hours: 35.00
|
Manual Reference:
|
Brief Description: Instrument Panel continues
|
|
This work has occurred over the last 4 weeks or so. With the help of my friend Curtiss, the instrument panel and face plates are power-coated and most instruments are in except the Comm, transponder, and Garmin 196. Next we will be installing it in the cabin and running the control cables & ignition.
Additionally, we have completed more engine work. The carb heat box, cabin heat box, ducting, fuel line, gascolator, oil pressure sensor, oil temp sensor, and sensors for the Grand Rapids EIS unit have been installed.
Total hrs. to date: 509
|
|
instrument panel
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |