KitLog pro

Powered By Kitlog Pro v2.0

Jonathan's RV-8 Build
' style=
Date:  6-28-2014
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Empennage Kit Inventory Part 1

Finally got around to opening the boxes and doing inventory of all the pieces and parts in the empennage kit. The smaller box contains the electronc trim servo, hardware, fibreglass, ribs, plans, manual, etc and the bigger box the spars, stiffeners, skins, etc. Very well packed and no damage found. The most challenging part was removing the industrial stength duct tape from the blue vinyl plastic without tearing it. Had a little stick to and tear the plastic, but nothing too major. Trying to keep as much on the aluminum as long as possible to protect it prior to priming. Amazing that this will all form the tail of my airplane.
' style=

Small Box

Small Box

' style=

Christmas in June

Christmas in June

' style=

Contents

Contents

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.