Powered By Kitlog Pro v2.0
Jonathan's RV-8 Build
RV-8
All
10-29-2015
< Previous Log Entry
Next Log Entry >
Date:
10-29-2015
Number of Hours:
3.50
Manual Reference:
Brief Description:
Riveting the HS Part 1
Riveted the rear spar. The Big Squeeze handled these larger rivets with ease. Having the extra set of hands was also very helpful. Thanks Colin! For the hinge bracket/self locking hardware, used the torque wrench to achieve the prescribed 28 in-lbs.
Colin w/ Big Squeeze
Rear Spar Factory Side
Shop Side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-8 Home
Category
# Logs
# Hours
All
33
114
Empennage
25
70
Project Prep
3
14
Shop
3
30
Shop Supplies
1
0
Tools
1
0
Copyright © 2001-2024 Matronics. All Rights Reserved.