KitLog pro

Powered By Kitlog Pro v2.0

Jon's Skybolt Project
' style=
Date:  4-6-2016
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Worked on the streamlined I-Strut tubing

Marked the centre-lines on the two sreamlined I-Strut tubes and marked 7 1/2" back from the centre of the front spar on each 1" I-Strut header tube. Positioned each tube and marked an approximate cut-line. Faily complex as the tube in forward and outward slanting.
' style=

Positioning the streamlined tube

Positioning the streamlined tube

' style=

Centre lines marked

Centre lines marked

' style=

Upper cut lines

Upper cut lines

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.