KitLog pro

Powered By Kitlog Pro v2.0

Vans RV-8 G-JBTR
' style=
Date:  4-12-2011
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Pre-Wiring TOP TIP

I was advised when doing the FWF to start with the immovable objects like the exhaust and plumb/wire around them.

I think the same advice goes to wiring the panel.

So far in my case the imovable objects are:

* Fresh air vent tubing
* Cables - Oil Cooler Door, Alternate Air Door, Parking Brake and Cabin Heat
* EFIS multipin connector mount
* Avionics Ground Bus

For these items I have made supports and p-clip support angles with nut plates.

It is surprising how long this takes to think/fabricate and you need to build into their locations your wire route plan.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.