Powered By Kitlog Pro v2.0
Vans RV-8 G-JBTR
RV-8 Build Log
All
4-12-2011
< Previous Log Entry
Next Log Entry >
Date:
4-12-2011
Number of Hours:
0.00
Manual Reference:
Brief Description:
Pre-Wiring TOP TIP
I was advised when doing the FWF to start with the immovable objects like the exhaust and plumb/wire around them.
I think the same advice goes to wiring the panel.
So far in my case the imovable objects are:
* Fresh air vent tubing
* Cables - Oil Cooler Door, Alternate Air Door, Parking Brake and Cabin Heat
* EFIS multipin connector mount
* Avionics Ground Bus
For these items I have made supports and p-clip support angles with nut plates.
It is surprising how long this takes to think/fabricate and you need to build into their locations your wire route plan.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Flying Log Home
RV-8 Build Log Home
Category
# Logs
# Hours
All
346
4096
Avionics
12
Electrics
22
300
Empennage
13
400
Engine
2
0
Fibreglass
55
460
Finish
17
Firewall Forward
32
280
Freight
1
Fuselage
58
1120
Inspiration
6
Miscellaneous
2
3
Paint
5
Panel
8
Primer
2
1
Prop
2
Registration
2
1
Research
3
375
Safety
1
27
Smoke System
5
100
Support
2
Test Phase
4
6
The Big Move
3
4
Tips
10
Tools
13
2
Upholstery
2
Wings
49
808
Workshop
8
57
Wrap Up
7
152
Copyright © 2001-2024 Matronics. All Rights Reserved.