Powered By Kitlog Pro v2.0
Vans RV-8 G-JBTR
RV-8 Flying Log
Maintenance
9-29-2014
< Previous Log Entry
Next Log Entry >
Date:
9-29-2014
Number of Hours:
0.00
Manual Reference:
Brief Description:
Wheel Pant Damage 4
You can see from the prime photos a slight ridge at the repair join. As this part is not going to be visible I felt it was "good enough".
Prime
Sand (320>600) and fill pin holes
Prime (flat with green scotchbrite)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Flying Log Home
Category
# Logs
# Hours
All
110
403
Avionics
1
Flying
91
Maintenance
17
376
Safety
1
27
RV-8 Build Log Home
Copyright © 2001-2024 Matronics. All Rights Reserved.