so today i ordered some more 3/8 inch tubing, due to all the wasted tubing i had trying to bend it to fit the fuselage. i decided to press ahead while i wait for resupply, and i drilled the elevator horns. i also made the elevator push tubes. the last thing i did was make the vent lines in the wing butts. the 1/4 inch tube is pretty easy to work with, so i knocked that out before taking the wings back off.