KitLog pro

Powered By Kitlog Pro v2.0

Josephs Web Site
' style=
Date:  10-23-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  fuel cells

i made the big step and sealed the left baffle on today. not nearly as bad as i had made it out to be. as i was going i pushed a rivet into every 7th or 8th hole to be sure the rivets were lining up square. once i had all the holes filled with clecos i went back and pulled the rivets out. i'll put the rivets in on sunday, and hopefully leak test on monday. i'll be really glad to be done with the fuel cells, once i'm there. this phase has been dragging on for a while.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.