KitLog pro

Powered By Kitlog Pro v2.0

Jacks Web Site
' style=
Date:  7-21-2007
Number of Hours:  5.00
Manual Reference:  8-16 7-11
Brief Description:  Assembled elevators to horizontal stab

Got the horizontal stabilizer and the elevators out on the bench to start the finish work on them. Pretty much followed the steps described in the instructions. Didn't get any pictures of this process, but it was pretty straightfoward. I paid a lot of attention to getting the elevators free moving an straight before drilling the holes in the horns and the center holes. I used a bushing to guide the drilling of the center pilot hole. This worked out pretty well.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.