KitLog pro

Powered By Kitlog Pro v2.0

Jacks Web Site
' style=
Date:  12-27-2006
Number of Hours:  2.50
Manual Reference:  8-2.16
Brief Description:  Started F-705 bulkhead

Fabricated the F-605B and drilled the F-605C brackets for rivets. Positioned and drilled the F-605B on the F-605A rear spar attach bulkhead. Made the F-705H spacers and drilled them. Pictures show these parts in assembly a few days from now.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.