Powered By Kitlog Pro v2.0
Jacks Web Site
RV-7A
All
12-27-2006
< Previous Log Entry
Next Log Entry >
Date:
12-27-2006
Number of Hours:
2.50
Manual Reference:
8-2.16
Brief Description:
Started F-705 bulkhead
Fabricated the F-605B and drilled the F-605C brackets for rivets. Positioned and drilled the F-605B on the F-605A rear spar attach bulkhead. Made the F-705H spacers and drilled them. Pictures show these parts in assembly a few days from now.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
728
2689
Canopy
26
127
Electrical
97
436
Empennage
30
110
Firewall forward
103
332
Fuselage
161
696
Gear fairings
5
17
Instrument Panel
78
419
Shop Setup
15
Wings
213
552
Copyright © 2001-2024 Matronics. All Rights Reserved.