KitLog pro

Powered By Kitlog Pro v2.0

Jacks Web Site
' style=
Date:  11-1-2006
Number of Hours:  2.50
Manual Reference:  7-11.11
Brief Description:  Prepared pushrods

Started the assembly of the pushroads. Made a jig for the drill press to hold the tubing while drilling. Sorry, didn't get a picture of this. The jig had blocks attached with holes in them cut to the size of the tubing. I clamped the jig to the drill press and drilled a hole down through the blocks to drill the holes in the tubes. This allowed me to rotate the tube through the six positions that needed holes without moving the jig. The blocks kept the tubing and drill bit properly aligned during drilling so that the holes where cut just where I wanted them. Drilled the hole with the VA-112's in place so that they were properly match drilled. Did basically the same with the smaller pushrods.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.