Powered By Kitlog Pro v2.0
Jacks Web Site
RV-7A
All
10-14-2006
< Previous Log Entry
Next Log Entry >
Date:
10-14-2006
Number of Hours:
2.50
Manual Reference:
7-7.11
Brief Description:
Cleaned up clecos and tools
Cleaned up all tools in preparation for sealing the tanks. Cleaned the bench and all the tools as well. Needed to get the stickiness off all the tools before proceeding. It was driving me crazy.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
728
2689
Canopy
26
127
Electrical
97
436
Empennage
30
110
Firewall forward
103
332
Fuselage
161
696
Gear fairings
5
17
Instrument Panel
78
419
Shop Setup
15
Wings
213
552
Copyright © 2001-2024 Matronics. All Rights Reserved.