KitLog pro

Powered By Kitlog Pro v2.0

Jacks Web Site
' style=
Date:  12-3-2011
Number of Hours:  3.00
Manual Reference:  ?
Brief Description:  Wired left lights, OAT, and antenna

Wired the landing light and ran wires for the Nav2 and Marker Beacon antennas, and the strobe and nav lights mounted in the wing tip. Ran the wires to the root for termination there. Mounted the OAT sensor in the same place as the OAT in the right wing. Terminated the wires into connectors at the root.
' style=

Landing lights

Landing lights

' style=

Left OAT sensor

Left OAT sensor

' style=

Root connectors

Root connectors

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.