Today I prepared the main control cable panel and mounted the cables to the second bulkhead. This panel includes the throttle, propeller, mixture, and bypass air cables. I assured that the cables would reach their connection points on the engine. I completed the firewall feedthrough plates for securing and gasketing the penetrations.