KitLog pro

Powered By Kitlog Pro v2.0

Jacks Web Site
' style=
Date:  4-25-2010
Number of Hours:  7.00
Manual Reference:  ?
Brief Description:  Adjusted the height of the baffles

I decided to increase the clearance between the baffles and the top cowl to 3/8". This meant taking the flanges off and cutting them down by 1/8". I also completed all of the other fabrication operations such as resizing of holes, dimpling, and filling. At this point, the baffles are ready to paint from a fabrication standpoint.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.