Powered By Kitlog Pro v2.0
N4371 Build Log
RV-10
All
10-19-2013
< Previous Log Entry
Next Log Entry >
Date:
10-19-2013
Number of Hours:
5.00
Manual Reference:
Brief Description:
Verticle Stab - drilling
Matched drilled all remaining parts on VS. Assembled VS skeleton with clecos and clecoed VS skin to skeleton. Began match drilling skin.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
5
32
Empennage
5
32
Copyright © 2001-2024 Matronics. All Rights Reserved.