Powered By Kitlog Pro v2.0
Air O Enterprises
RV-8
All
3-10-2005
< Previous Log Entry
Next Log Entry >
Date:
3-10-2005
Number of Hours:
6.00
Manual Reference:
8-23
Brief Description:
Install front seatback weldment.
Install front seatback weldment. Replaced factory with optional tall pilot weldment. Also, added new hinge line aft of the factory position to move the bottom of the front seat aft 1.25"
Tall pilot seat back weldment.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
92
1195
Avionics
13
138
Empennage
10
60
Engine
15
201
Fuselage
40
535
Paint
7
213
Wings
7
48
Copyright © 2001-2024 Matronics. All Rights Reserved.