Powered By Kitlog Pro v2.0
Air O Enterprises
RV-8
All
2-19-2005
< Previous Log Entry
Next Log Entry >
Date:
2-19-2005
Number of Hours:
8.00
Manual Reference:
8-17
Brief Description:
Allign and attach Vertical stab Leading Edge.
Allign and attach Vertical stab Leading Edge. Rivot and bolt front alignment aluminum into position.
Leading edge spar detail.
Finished alignment.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
92
1195
Avionics
13
138
Empennage
10
60
Engine
15
201
Fuselage
40
535
Paint
7
213
Wings
7
48
Copyright © 2001-2024 Matronics. All Rights Reserved.