KitLog pro

Powered By Kitlog Pro v2.0

Jamey&Ricks Rans S6S
' style=
Date:  6-21-2008
Number of Hours:  5.00
Manual Reference:  02a-21 02a-24-1
Brief Description:  Gear, Gear Fairing and Floorboard

Today got the tires mounted, figured out the brake assembly and how its mounted, a little frustrating but just slow it down read the directions(and remember the 3 spacers) and it all works out. . Trimmed both gear fairings up , installed the ribs and trimmed to fit .Well our first mistake we trimmed a lot of material on the gear fairing on the bottom, just forward and below Where the two screws go. The 2 screws hold the fairing just fine and the top is snug against the fuselage, Just being critical of our work. Actually wouldn’t have known differently bit stopped and looked at friends s-7 gear legs and got a different perspective , should have just trimmed the top only, for a neater look at the bottom ,I’ll post some pics when my camera decides to work took 12 pics only 2 came out. . Installed the floorboard, on the QB the holes are drilled along with the nut plates and channels being installed. Some of the bolt would not line up with the nut plated, a couple of the holes were drilled at a slight angle, just redrilled and lines up the bolts no biggy. The last task of the day is just to collect the parts for the rudder. Pedal installation .6/23/08...update looked at some other s-6 wheel pants they did the same thing i did, so we'll be fine sigh...of...relief
' style=





' style=

gear fairing rib

gear fairing rib

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.