KitLog pro

Powered By Kitlog Pro v2.0

Jamey&Ricks Rans S6S
' style=
Date:  6-19-2008
Number of Hours:  3.00
Manual Reference:  2-4
Brief Description:  Maine Gear

Finally , first day of building. Take ten minutes to find all the parts, hey that inventory/getting organized thing actually works, found everything where I left em. I started with the gear legs, the qb legs are already drilled out so it was just a matter of some light sanding cleaning and light oil to persuade the gear holes to line up, temporarily install the bolt. Trimmed the gear fairing plastic ribs to size marked the centerline and put aside, brought home the tires, tubes, and rim. Assembled no problem used lots of soapy water does the trick. Cleaned the bearings and greased them. Could of waited on that but oh well. Still bringing tools and supplies to hanger, kind of a pain when you need something and its at home and home is a thirty minute drive. But there is a hardware store 1 min away, been giving them a lot of business lately. I have more pictures but this program will only let you post three, so maybe in future I post to some picture website.
' style=





' style=

Temporary Bolt

Temporary Bolt

' style=

1st wheel

1st wheel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.