Removed the prop govenor and disassembled it to reorient it. Cut the safety wire on the screws and rotated the arm. Will have to move it a little more. Adjusted the exhaust stablization and will install after the heat box is on. Installed the heat box . Installed all 3 cables,but the movement is not good.Will redrill the 3 holes in the forward section of the gear tower