DRILLED OUT THE 2 SPACERS THAT HOLD THE AN-25 BOLTS. DRILLED OUT THE PUSHROD ASSEMBLY THAT HOLDS THE BOLTS. REINSTALLED THE CONTROL ROD SYSTEM. INSTALLED THE VERTICAL STAB AND RUDDER. CHECKED THE RUDDER STOP PIECES F-886.BOLTED THE ADJUSTABLE RUDDER/BRAKE SYSTEM.MADE THE F-886 MOUNTING PLATE AND SPACER. PRIMED ALL OF THE SMALL PARTS. STARTED ASSEMBLY OF THE BRAKE LINESPER SECTION B-B ON DWG 34. ALSO INSTALLED THE 2 REAR SEAT BELT F857 ON DWG 32, VIEW G-G.