WE DRILLED OUT THE 4 FORWARD HOLES IN THE STAB AND INSERTED THE AN3-10 BOLTES. HOWEVER WHEN MEASURING THE STAB, I DISCOVERED THAT THE REAR PORTION OF THE STAB HAD MOVED AND THE HOLES WERE OFFSET. I CALLED VANS AND EMAILED THEM SOME PICTURES. MEANWHILE, WE WORKED ON THE BAGGAGE DOOR TO PREPARE FOR RIVETING.