Powered By Kitlog Pro v2.0
Jaco Swanepoel's KR2S Web Site
KR2S
Fuel Tanks
1-13-2005
< Previous Log Entry
Next Log Entry >
Date:
1-13-2005
Number of Hours:
6.00
Manual Reference:
Dwg 69
Brief Description:
Fuel Tanks
The fuel tanks were completed and pressure tested by Weld It All. The fuel cap neck, vent connection, gascolator connection and strainer fittings were welded into place.
LEFT FUEL TANK TOP VIEW
LEFT FUEL TANK INBOARD VIEW
LEFT FUEL TANK BOTTOM VIEW
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
KR2S Home
Category
# Logs
# Hours
All
148
977
Avionics
3
20
Ballistic Parachute
5
32
Canopy
3
9
Controls
11
55
Cowling
5
22
Empennage
1
Engine
34
224
Fuel Tanks
6
35
Fuselage
22
212
Instrument Panel
10
60
Interior
7
46
Under Carrige
14
73
Wings
27
189
KR2S Home
Copyright © 2001-2024 Matronics. All Rights Reserved.