Powered By Kitlog Pro v2.0
Jaco Swanepoel's KR2S Web Site
KR2S
Engine
11-29-2005
< Previous Log Entry
Next Log Entry >
Date:
11-29-2005
Number of Hours:
2.00
Manual Reference:
Brief Description:
Fuel Rail
I manufactured steel mounting brackets and silver soldered them to the fuel rail sleeves. The mounting brackets attach to the same bolt as the injector brackets and will ensure that the fuel rail does not come off under pressure.
Fuel Rail
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
KR2S Home
All
Avionics
Ballistic Parachute
Canopy
Controls
Cowling
Empennage
Engine
Fuel Tanks
Fuselage
Instrument Panel
Interior
Under Carrige
Wings
KR2S Home
Copyright © 2001-2013 Matronics. All Rights Reserved.